fbpx Port Moresby Power Grid Development Project: Rouna 1 Hydropower Station Rehabilitation and Upgrade | Asian Development Bank

Port Moresby Power Grid Development Project: Rouna 1 Hydropower Station Rehabilitation and Upgrade

Initial Environmental Examination | September 2012

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated September 2012 is provided for the ADB project 43197-013 in Papua New Guinea.