Port Moresby Power Grid Development Project: Upgrade of 11kV System to Open Loop Mesh

Initial Environmental Examination | December 2012

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated December 2012 is provided for the ADB project 43197-013 in Papua New Guinea.