fbpx Power Transmission Enhancement Investment Program - Tranche 4: The Construction of New 220 kV Nowshera Grid Station and Allied 2 km Transmission Line Initial | Asian Development Bank

Power Transmission Enhancement Investment Program - Tranche 4: The Construction of New 220 kV Nowshera Grid Station and Allied 2 km Transmission Line Initial

Initial Environmental Examination | September 2014

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated September 2014 is provided for the ADB project 37192-044 in Pakistan.