fbpx Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Draft Initial Environmental Examination | Asian Development Bank

Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Draft Initial Environmental Examination

Initial Environmental Examination | September 2018

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated September 2018 is provided for the ADB project 51116-002 in the People's Republic of China.