Eco-Industrial Park Waste-to-Energy Project: Report and Recommendation of the President
SHARE THIS PAGE
The project entails the financing of a portfolio of waste-to-energy plants to be constructed and operated by SUS, located primarily in second and third tier cities in the People’s Republic of China. SUS can treat municipal solid waste, biomass, sludge, kitchen, food, medical, construction, and electronic waste within Eco-Industrial Parks to achieve maximum resource recovery and minimize pollution, in a closed loop recycling system. The project targets total waste treatment capacity of 1.1 million tons per annum by 2020.
The report and recommendation of the President to the Board of Directors (RRP) document describes the terms and conditions of a project for consideration and approval by ADB's Board of Directors.
This document dated November 2018 is provided for the ADB project 51399-001 in the People's Republic of China.