fbpx Dynagreen Waste-to-Energy Project: Huizhou Waste-to-Energy Plant Initial Environmental Examination | Asian Development Bank

Dynagreen Waste-to-Energy Project: Huizhou Waste-to-Energy Plant Initial Environmental Examination

Initial Environmental Examination | October 2015

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated October 2015 is provided for the ADB project 46930-014 in the People's Republic of China.