TA 8451-PRC: Jiangxi Pingxiang Integrated Rural-Urban Infrastructure Development Final Report
Consultants' Reports
|
November 2015
SHARE THIS PAGE
Download(Free : 6 available)
- Main Report and Appendixes (5.96 MB)
- Supplementary Document 1: Integrated River Rehabilitation and Flood Risk Management – An Integrated and Ecological Approach Cont (9.77 MB)
- Supplementary Document 2: Engineering Technical Analysis of the Wastewater Component (2.03 MB)
- Supplementary Document 3: Engineering Technical Analysis of the Road Component (2.3 MB)
- Supplementary Document 4: Poverty and Social Analysis (4.05 MB)
- Supplementary Document 5: Environmental Impact Assessment and Environmental Management Plan (5.59 MB)
Consultants' reports describe activities by a consultant or group of consultants related to preparing a technical assistance project.
This document dated November 2015 is provided for the ADB project 47030-001, 47030-002 in the People's Republic of China.