fbpx Preparing the Integrated Flood and Riverbank Erosion Risk Management Project– Assam (Phase 2): Processing and Institutional Strengthening | Asian Development Bank

Preparing the Integrated Flood and Riverbank Erosion Risk Management Project– Assam (Phase 2): Processing and Institutional Strengthening

Technical Assistance Reports | September 2008

Technical assistance reports provide the context and background of the project, and provide information on impacts and outcomes; key activities; estimated costs; financing; and implementation arrangements.

This document dated September 2008 is provided for the ADB project 38412-022 in India.