SASEC Second Bangladesh-India Electrical Grid Interconnection Project: Report and Recommendation of the President
Reports and Recommendations of the President | September 2015
The report and recommendation of the President (RRP) document describes the terms and conditions of a project for consideration and approval by ADB.
This document dated September 2015 is provided for the ADB project 44192-016 in Bangladesh.
Linked Documents
- Loan Agreement: Asian Development Fund
- Loan Agreement: Ordinary Capital Resources
- Project Agreement
- Sector Assessment (Summary): Energy (Power)
- Project Administration Manual
- Contribution to the ADB Results Framework
- Development Coordination
- Financial Analysis
- Economic Analysis
- Country Economic Indicators
- Summary Poverty Reduction and Social Strategy
- Initial Environmental Examination
- Resettlement Plan
- Risk Assessment and Risk Management Plan
- Project Climate Risk Assessment and Management Report