National Power Grid Strengthening Project: Report and Recommendation of the President

Reports and Recommendations of the President | October 2018
SHARE THIS PAGE

The report and recommendation of the President to the Board of Directors (RRP) document describes the terms and conditions of a project for consideration and approval by ADB's Board of Directors.

This document dated October 2018 is provided for the ADB project 49370-002 in Turkmenistan.

Linked Documents/Annexes
  1. Loan Agreement
  2. Project Agreement
  3. Sector Assessment (Summary): Energy
  4. Project Administration Manual
  5. Contribution to the ADB Results Framework
  6. Development Coordination
  7. Financial Analysis
  8. Economic Analysis
  9. Country Economic Indicators
  10. Summary Poverty Reduction and Social Strategy
  11. Risk Assessment and Risk Management Plan
  12. Attached Technical Assistance Report
  13. Initial Environmental Examination
  14. Technical Due Diligence [Withheld from Public Disclosure Para. 97 (ii) Information exchanged with ADB members and other entities]
  15. Social Due Diligence [Withheld from Public Disclosure Para. 97 (ii) Information exchanged with ADB members and other entities]
  16. Load-Flow Analysis with and without the Project [Withheld from Public Disclosure Para. 97 (ii) Information exchanged with ADB members and other entities]