Outer Island Maritime Infrastructure Project (Third Additional Financing): Report and Recommendation of the President

Reports and Recommendations of the President | November 2023
SHARE THIS PAGE

The project is helping Tuvalu overcome domestic maritime connectivity constraints by (i) constructing small workboat harbors in the outer islands of Niutao, Nui, and Nukulaelae; (ii) rehabilitating boat ramps in Nanumaga and Niutao; (iii) strengthening the government’s capacity for operation and maintenance (O&M) of the harbors; and (iv) developing a transport sector master plan. The proposed additional financing will only fund cost overruns without changing the scope of the project.

The report and recommendation of the President to the Board of Directors (RRP) document describes the terms and conditions of a project for consideration and approval by ADB's Board of Directors.

This document dated November 2023 is provided for the ADB projects 48484-002 and 48484-006 in Tuvalu.

Linked Documents/Annexes