fbpx Uttarakhand Power Sector Investment Program - Project 4: 400 KV GIS Substation at Kuwaripass (Pipalkoti) | Asian Development Bank

Uttarakhand Power Sector Investment Program - Project 4: 400 KV GIS Substation at Kuwaripass (Pipalkoti)

Initial Environmental Examination | April 2010

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated April 2010 is provided for the ADB project 37139-053 in India.