fbpx Ha Noi and Ho Chi Minh City Power Grid Development Sector Project: Construction of 110-kV Transmission Line from Thuong Tin Substation to Quat Dong Substation (EVN Ha Noi) Initial Environmental Examination | Asian Development Bank

Ha Noi and Ho Chi Minh City Power Grid Development Sector Project: Construction of 110-kV Transmission Line from Thuong Tin Substation to Quat Dong Substation (EVN Ha Noi) Initial Environmental Examination

Initial Environmental Examination | October 2019

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated October 2019 is provided for the ADB project 46391-001 in Viet Nam.