Power Transmission Investment Program - Tranche 1 - 500kV/220kV Bac Ninh 2–Pho Noi Transmission Line Subproject: Semiannual Environmental Monitoring Report No. 2 (July-December 2014)

Environmental Monitoring Reports | December 2014

Environmental monitoring reports describe the environmental issues or mitigation measures of a project.

This document dated December 2014 is provided for the ADB project 42039-034 in Viet Nam.