Power Transmission Investment Program (Tranche 1) - 500kV/220kV Bac Ninh 2–Pho Noi Transmission Line Subproject: Semiannual Environmental Monitoring Report No. 1 (April-September 2014)

Environmental Monitoring Reports | September 2014

Environmental monitoring reports describe the environmental issues or mitigation measures of a project.

This document dated September 2014 is provided for the ADB project 42039-034 in Viet Nam.

Project Number 
 
Countries 
 
Subjects