Projects in Indonesia

Title Country Status Approval Datesort ascending
43220-014 Loan 3529 / Loan 8327

Integrated Participatory Development and Management of Irrigation Program

Indonesia Approved 18 May 2017
50156-001 Private Sector Loan 50156

Muara Laboh Geothermal Power Project

Indonesia Active 07 Dec 2016
50380-001 Technical Assistance 9269

Strengthening Performance Management System in the Ministry of National Development Planning (BAPPENAS)

Indonesia Active 07 Dec 2016
49222-001

Tangguh Liquefied Natural Gas Expansion Project

Indonesia Approved 01 Dec 2016
50168-001 Loan 3454

Fiscal and Public Expenditure Management Program (Subprogram 1)

Indonesia Active 10 Nov 2016
49141-001 Loan 3455

Accelerating Infrastructure Delivery through Better Engineering Services Project

Indonesia Active 10 Nov 2016
49154-001 Technical Assistance 9198

Sewerage System Development Project

Indonesia Active 07 Oct 2016
35182-043 Loan 3440

Flood Management in Selected River Basins Sector Project

Indonesia Active 30 Sep 2016
47084-002 Grant 0501

Community-Focused Investments to Address Deforestation and Forest Degradation

Indonesia Active 30 Sep 2016
49204-002 Technical Assistance 9189

Pilot Carbon Capture and Storage Activity in the Natural Gas Processing Sector

Indonesia Active 29 Sep 2016
46380-015 Technical Assistance 9116

Sustainable Infrastructure Assistance Program - Improving Multimodal Connectivity to Support Integrated Land and Sea Tollway (Subproject 7)

Indonesia Active 16 May 2016
46380-016 Technical Assistance 9113

Sustainable Infrastructure Assistance Program-Strengthening Verification in Results-Based Programs in Indonesia's Power Sector (Subproject 8)

Indonesia Active 16 May 2016
46380-009 Technical Assistance 9109

Sustainable Infrastructure Assistance Program - Strengthening Fiscal Risk Management of Accelerated Infrastructure Delivery (Subproject 9)

Indonesia Active 06 May 2016
49203-001 Technical Assistance 9082

Eastern Indonesia Sustainable Energy Access Sector Project

Indonesia Active 02 Mar 2016
48466-001 Technical Assistance 9054

Enhancing the Regulatory Framework of Financial Sector Development and Oversight

Indonesia Active 16 Dec 2015
49080-001 Loan 3339 / Loan 8297

Electricity Grid Strengthening—Sumatra Program

Indonesia Active 02 Dec 2015
49043-001 Loan 3303 / Loan 8293

Sustainable and Inclusive Energy Program (Subprogram 1)

Indonesia Closed 30 Sep 2015
48207-001 Loan 3274

Financial Market Development and Inclusion Program Subprogram 1

Indonesia Closed 01 Sep 2015
49901-001 Technical Assistance 8885

Development of West Timor Wind Power

Indonesia Approved 31 Mar 2015
48294-001 Technical Assistance 8877

Tax Revenue Administration Modernization and Policy Improvement in Local Governments

Indonesia Active 12 Feb 2015

Pages

 Development Effectiveness Brief
Indonesia: Development Effectiveness Brief

Beginning in 1966, early ADB assistance to Indonesia focused on agriculture but rapidly diversified in the 1980s to include energy, infrastructure, and education. In the years following the 1998 Asian Financial Crisis, ADB provided significant and sustained support to the government's ambitious program of reform and poverty reduction, particularly through program loans that encompassed development policy, infrastructure sector reform, capital market development, governance reform, and achievement of the Millennium Development Goals.

The country partnership strategy for 2012-2014 is closely attuned to the needs of Indonesia as a large middle-income country. Guided by the government’s commitment to “pro-poor, pro-job, pro-growth, and pro-environment” development, the two strategic CPS pillars are inclusive growth and environmental sustainability, including climate change mitigation and adaptation.

The country brief summarizes how the partnership between the Government of Indonesia and ADB has contributed to the development of the country.

  Download

Result Indicators (2010-2014)

Energy

 

Nearly 258,600 tCO2equivalent per year in greenhouse gas emission reduction

258,550 tCO2: The avoided CO2 equivalent emission as a result of a clean energy project or component of a project. Projects with CO2 emission reduction include renewable energy generation, energy efficiency projects in supply and demand side, and use of cleaner fuels such as natural gas in place of coal or oil.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34100: Renewable Energy Development Sector Project
Sector Project 1982 19-Dec-02 30-Jun-14 258,550.00
 

Nearly 121,300new households connected to electricity

121,294: Number of new households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 1,294.00
34100: Renewable Energy Development Sector Project
Sector Project 1982 19-Dec-02 30-Jun-14 120,000.00
 

Nearly 120,900new rural households connected to electricity

120,851.50: Number of new rural households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 851.50
34100: Renewable Energy Development Sector Project
Sector Project 1982 19-Dec-02 30-Jun-14 120,000.00
 

Over 442new urban households connected to electricity

442.50: Number of new urban households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 442.50
 

Over 74 MWinstalled energy generation capacity

74.80 MW: Aggregated additional capacity in megawatts (MW) resulting from generation projects using conventional and renewable energy sources.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34100: Renewable Energy Development Sector Project
Sector Project 1982 19-Dec-02 30-Jun-14 74.80
 

Over 74 MWinstalled renewable energy generation capacity

74.80 MW: Aggregated additional capacity in megawatts (MW) resulting from generation projects using renewable energy sources.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34100: Renewable Energy Development Sector Project
Sector Project 1982 19-Dec-02 30-Jun-14 74.80
 

Over 96 kilometerstransmission lines installed or upgraded

96.80 kilometers: Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 31.00
38919-014: Tangguh Liquefied Natural Gas Project
Loan 7224/L2214 14-Dec-05 15-Nov-10 39.80
34100: Renewable Energy Development Sector Project
Sector Project 1982 19-Dec-02 30-Jun-14 26.00

Transport

 

Over 4.67 million average daily vehicle-kilometersuse of roads built or upgraded in the first full year of operation

4,674,202 average daily vehicle-kilometers: Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34159: Road Rehabilitation-2 Project
Project 2184 29-Sep-05 19-Apr-11 4,674,202.00
 

Over 23,200 kilometersroads built or upgraded

23,222.20 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 3,849.00
34159: Road Rehabilitation-2 Project
Project 2184 29-Sep-05 19-Apr-11 1,145.10
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 75.00
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 1,600.00
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 15-Aug-02 15-Aug-02 11,630.00
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 1,636.00
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project L1962 06-Dec-02 01-Aug-12 7.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 3,280.10
 

Nearly 1,400 kilometersexpressways and national highways built or updgraded

1,393.10 kilometers: Expressways and national highways built or updgraded (kilometers)

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 176.00
34159: Road Rehabilitation-2 Project
Project 2184 29-Sep-05 19-Apr-11 1,145.10
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 72.00
 

Nearly 21,830 kilometersprovincial, district, and rural roads built or upgraded

21,829.10 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 3,673.00
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 3.00
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 1,600.00
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 15-Aug-02 15-Aug-02 11,630.00
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 1,636.00
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project L1962 06-Dec-02 01-Aug-12 7.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 3,280.10
 

Over 21,200 kilometersrural roads built or upgraded

21,205 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 3,849.00
34159: Road Rehabilitation-2 Project
Project 2184 29-Sep-05 19-Apr-11 753.50
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 49.40
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 15-Aug-02 15-Aug-02 11,630.00
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 1,636.00
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project L1962 06-Dec-02 01-Aug-12 7.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 3,280.10
 

Over 2,000 kilometersurban roads built or upgraded

2,017.30 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34159: Road Rehabilitation-2 Project
Project 2184 29-Sep-05 19-Apr-11 391.60
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 25.70
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 1,600.00

Water

 

Over 816,400households with new or improved water supply

816,468: All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 423,200.00
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 31,273.00
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 6,500.00
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 48,110.00
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project L1962 06-Dec-02 01-Aug-12 4,000.00
34152-013: Community Water Services and Health Project
Project 2163/2164 07-Apr-05 05-Jul-13 93,143.00
34152-013: Community Water Services and Health Project
Project 2164 07-Apr-05 05-Jul-13 109,568.00
41913-014: PT Pam Lyonnaise Jaya (West Jakarta Water Supply)
Loan 7262/2349 31-Aug-07 18-Mar-12 70,329.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 30,345.00
 

Nearly 729,000rural households with new or improved water supply

728,943.60: All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 423,200.00
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 20,577.60
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 48,110.00
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project L1962 06-Dec-02 01-Aug-12 4,000.00
34152-013: Community Water Services and Health Project
Project 2163/2164 07-Apr-05 05-Jul-13 93,143.00
34152-013: Community Water Services and Health Project
Project 2164 07-Apr-05 05-Jul-13 109,568.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 30,345.00
 

Over 87,500urban households with new or improved water supply

87,524.40: All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 10,695.40
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 6,500.00
41913-014: PT Pam Lyonnaise Jaya (West Jakarta Water Supply)
Loan 7262/2349 31-Aug-07 18-Mar-12 70,329.00
 

Over 148,600households with new or improved sanitation

148,632: All additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before or benefit from systems of lesser order, and households that are already benefiting from sanitation services but are provided with improved service, e.g., sewer connection, septic tank, pour-flush, simple pit latrine, or ventilated improved pit latrine.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 15,870.00
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 26,200.00
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 5,300.00
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project L1962 06-Dec-02 01-Aug-12 8,167.00
34152-013: Community Water Services and Health Project
Project 2163/2164 07-Apr-05 05-Jul-13 39,148.00
34152-013: Community Water Services and Health Project
Project 2164 07-Apr-05 05-Jul-13 46,132.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 7,815.00
 

Over 10,300 kilometerswater supply pipes installed or upgraded

10,310.20 kilometers: All sizes of new and repaired or upgraded pipes intended to transport water for urban water use for domestic and nonagricultural business purposes, expressed as their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39597: Rural Infrastructure Support Project
Project 2221 19-Dec-05 11-Aug-09 656.90
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 27.80
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 50.00
34152-013: Community Water Services and Health Project
Project 2163/2164 07-Apr-05 05-Jul-13 3,488.70
34152-013: Community Water Services and Health Project
Project 2164 07-Apr-05 05-Jul-13 4,111.30
41913-014: PT Pam Lyonnaise Jaya (West Jakarta Water Supply)
Loan 7262/2349 31-Aug-07 18-Mar-12 1,940.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 35.50
 

Nearly 520,000 hectaresland improved through irrigation, drainage and/or flood management

519,013.50 hectares: Rural land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 56,400.00
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 15-Aug-02 15-Aug-02 3,553.50
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project L2449 29-Sep-08 09-Sep-11 1,540.00
38385: Rural Infrastructure Support to the PNPM Mandiri Project II
Project 2575 29-Sep-08 09-Sep-11 300.00
32359: Participatory Irrigation Sector Project
Sector Project 2064/2065/4299 19-Dec-03 20-Feb-14 118,877.20
32359: Participatory Irrigation Sector Project
Sector Project 2064/2065/4299 19-Dec-03 20-Feb-14 338,342.80

Finance

 

Over 13,100 accountsmicrofinance loan accounts opened / end borrowers reached

13,164 accounts: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 11,000.00
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 2,164.00
 

Over 7,640 female accountsmicrofinance loan accounts opened / end borrowers reached

7,646.90 female accounts: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 6,500.00
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 1,146.90
 

Over 5,510 male accountsmicrofinance loan accounts opened / end borrowers reached

5,517.10 male accounts: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39127: Earthquake and Tsunami Emergency Support Project
Project G0002 07-Apr-05 30-Dec-10 4,500.00
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 19-Dec-03 31-May-11 1,017.10

Education

 

Over 1.7 million studentsstudents benefiting from new or improved educational facilities

1,723,540 students: Total number of students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
31137-013: Decentralized Basic Education Project (L)
Project L1863 29-Nov-01 30-Jun-09 1,573,540.00
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 150,000.00
 

Over 882,200 female studentsfemale students benefiting from new or improved educational facilities

882,226 female students: Total number of female students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
31137-013: Decentralized Basic Education Project (L)
Project L1863 29-Nov-01 30-Jun-09 807,226.00
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 75,000.00
 

Over 841,300 male studentsmale students benefiting from new or improved educational facilities

841,314 male students: Total number of male students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
31137-013: Decentralized Basic Education Project (L)
Project L1863 29-Nov-01 30-Jun-09 766,314.00
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 75,000.00
 

Nearly 123,700 studentsstudents educated and trained under improved quality assurance systems

123,665 students: Total number of students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 123,665.00
 

Over 61,800 female studentsfemale students educated and trained under improved quality assurance systems

61,832.50 female students: Total number of female students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 61,832.50
 

Over 61,800 male studentsmale students educated and trained under improved quality assurance systems

61,832.50 male students: Total number of male students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 61,832.50
 

Over 5,800 teachersteachers trained with quality or competency standards

5,831 teachers: Number of teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 5,831.00
 

Over 2,700 female teachersfemale teachers trained with quality or competency standards

2,740.60 female teachers: Number of female teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 2,740.60
 

Nearly 3,100 male teachersmale teachers trained with quality or competency standards

3,090.40 male teachers: Number of male teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37475: Madrasah Education Development Project
Project 2294 15-Dec-06 03-Feb-14 3,090.40

The table includes projects completed during the period, and funded by ADB's ordinary capital resources and/or the Asian Development Fund, cofinanciers, and the government. The outputs presented are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. ADB monitors progress on these outputs in the annual Development Effectiveness Review. The numbers represent the sum of outputs and beneficiaries of individual projects. Therefore, the beneficiary numbers reported under education—teachers trained, and students benefitting from school improvement programs or direct support—include those who benefited from more than one project.

Source: ADB project completion reports