fbpx Taun Ilektrifikesen Invesmen Program – Trens 2: Projek Rekot Pepa | Asian Development Bank

Taun Ilektrifikesen Invesmen Program – Trens 2: Projek Rekot Pepa

Translated PDS | March 2017

Ol hap o komponen bilong PFR bilong kisim fanding aninit long dispela askim em: Komposen 1: Stretim gen tupela hairdo pawa plent: (i) Yonki Toe of Dam (YTOD) haidropawa plent, na (ii) Warangoi haidropawa plent, nau ol i no wok long mak bilong strong bilong ol. Bihain long ol i stretim ol dispela plent masin bai inap long wok long reit kepesiti bilong 28.0 MW-18 MW YTOD, na 10 MW Warangoi plent. Antap moa long dispela, dispela wok bilong stretim ol dipsela masin bai mekim ikonomik laip bilong ol i go moa long 20 o 25 yia na ol bai wok gut long standet bilong nau. Komponen 2: Konstraksen bilong Ramazon run-of-river liklik haidropawa plent wantaim strong bilong 3 MW. Projek bai wokim wanpela (i) concrete weir, (ii) 5 km paiplain, (iii) penstock, (iv) pawahaus, na (v) nupela rot bilong go insait long bung wantaim rot nau i go long pawahaus na ol rot insait long projek eria.

This document dated March 2017 is provided for the ADB project 41504-025 in Papua New Guinea.